Construction Update: June 13, 2017

Post Date:June 13, 2017 10:55 am

High Performance Sports Field

Buildings are continuing.  Roof decks and structural steel are being installed.  Interior walls and floor slabs are being installed this week.

The storm pond expansion is underway.  Underground utilities are 98% complete.

Southfort Drive will be closed between 84 Street and Southfort Boulevard starting Wednesday June 7 until Wednesday June 14. Please watch for signs and notices.

Installation of turf is expected in August.  

 

Curling Rink

Detailed design is complete.  The Construction Manager has closed the renovation tender 

Interior demolition is complete.

Foundations and Exterior work to begin once tenders are evaluated and awarded.

 

Historic Precinct Washrooms / Site Improvements

The washrooms are open.  

Trails and Warden's House Parking Lot are under construction.

Lights in the Village area and Parking Lot will be installed later this summer or early fall depending on Fortis Schedule.

  

Transportation Master Plan

Work will continue through the winter to complete the report for Council and Public presentation. 

 

Southfort Drive Widening

Ground preparation is ongoing.  Base gravel is being placed along Southfort Drive.

Stripping of topsoil is continuing along Southfort Drive.

 

Harbour Pool Universal Change Room

The project design is underway.

 

Water Meter Radio Upgrade

The project was awarded to Corix.  

Work is underway.

 

Installation of Foundation Drain Services

The tender has been awarded. Work is beginning this week.

 

Skateboard Park

Comments are being reviewed prior to finalizing the concept and moving to detailed design.  The Skateboard Society is continuing to fund-raise for the project and are hoping to proceed with construction this fall.

 

Neighbourhood Rehabilitation - Ross Drive

Contractor has provided their schedule and will be onsite the beginning of July with all work complete (other than landscaping) completed by the end of September.

 

Sewer Reline

Mainline work is complete.

The sewer lateral tender has been awarded, once the schedule is confirmed notices will be delivered to affected residents.

 

City Facility Roof Replacements

Roofs on Harbour Pool, Legion, CN Station, and the James E. Graham Building will be replaced this summer.   

The upper roof on Harbour Pool is being completed.  The CN Station roof is underway.

 

Historic Precinct - Court House

Windows and Doors on the Court House are being refurbished this summer.  Work will start this spring and is expected to continue throughout the summer.

 

River Valley Staircase

A staircase will be constructed to access the River Valley from Riverpark Drive.  Contractor is working on Shop Drawings to prepare the steel structure. Installation will begin once approval and fabrication is complete.

 

Kinsmen Playground Replacement

Playground design has been chosen and awarded.  Schedule will be confirmed with contractor once order lead times are known.

 

Dog Park

Lights on the access road and parking lot will be installed late this summer / early fall depending on schedule from Fortis.

 

Westpark Boulevard Traffic Lights

The Developer is installing traffic lights on Westpark Boulevard at the Commercial entrance near Husky.

 

Street Light Upgrades

Fortis will be upgrading the street lights throughout the City to LED lights.  Their contractor is expected to start at the beginning of June and be complete by the end of June.

Return to full list >>
Roller & Laser

The City of Fort Saskatchewan endeavours to keep residents and visitors up-to-date about ongoing City construction projects.

For further information phone 780-992-6198.

List of Requests for Proposals (RFP)

Pre-qualified Contractors List

The City of Fort Saskatchewan is developing a Pre-qualified contractors list for miscellaneous work up to $50,000 in value. The pre-qualification process consists of a safety questionnaire, a qualifications questionnaire and a listing of the work contractors are interested in.

The pre-qualified list will be used to request quotations for small contracts that come up during annual operations. Contract values are expected to be below $50,000 per contract.

Documents will be continually accepted and contractors added to the list. It is anticipated that interested contractors will be required to update their information on an annual basis.


 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer