Construction Update: May 30, 2017

Post Date:May 30, 2017 11:12 am

High Performance Sports Field

Buildings are continuing.  Roof decks and structural steel are being installed.  Interior walls and floor slabs are being installed this week.

The storm pond expansion is underway.  Underground utilities are 90% complete.

Southfort Drive will be closed between 84 Street and Southfort Boulevard, 2 weeks notice will be provided prior to closure. Please watch for signs and notices.

Installation of turf is expected in August.  

 

Curling Rink

Detailed design is complete.  The Construction Manager has the renovation work out for tender.  

Hazardous material abatement is complete.  Interior demolition will be complete this week.

Work on the new foundations is scheduled to start next week.

 

Historic Precinct Washrooms / Site Improvements

The washrooms are open.  

Trails are under construction.  The parking lot by the Warden's House will be expanded as part of the work.

Lights in the Village area and Parking Lot will be installed later this summer or early fall depending on Fortis Schedule.

  

Transportation Master Plan

Work will continue through the winter to complete the report for Council and Public presentation.  Draft findings are expected in May.

 

Southfort Drive Widening

Work is underway.  

Material has been removed from 84 Street allowing the preparation of the ground for gravel material.  Southfort Drive is progressing about 4 days behind 84 Street. 

 

Harbour Pool Universal Change Room

The project design is underway.

 

Water Meter Radio Upgrade

The project was awarded to Corix.  

Work is underway.

 

Installation of Foundation Drain Services

The tender has been awarded. Work is scheduled to begin June 1.

 

Skateboard Park

There is a survey on the City's Website to provide feedback on the final concept.

 

Neighbourhood Rehabilitation - Ross Drive

Contractor has provided their schedule and will be onsite the beginning of July with all work complete (other than landscaping) completed by the end of September.

 

Sewer Reline

Mainline work is underway.  The Contractor is working at night to complete the work in congested areas with minimal disruption to schools, traffic, etc.

The sewer lateral tender is closed and is being evaluated. 

 

City Facility Roof Replacements

Roofs on Harbour Pool, Legion, CN Station, and the James E. Graham Building will be replaced this summer.   

The upper roof on Harbour Pool is being completed.  The CN Station roof is underway.

 

Historic Precinct - Court House

Windows and Doors on the Court House are being refurbished this summer.  Work will start this spring and is expected to continue throughout the summer.

 

River Valley Staircase

A staircase will be constructed to access the River Valley from Riverpark Drive.  Contractor is working on Shop Drawings to prepare the steel structure.  Installation will begin once approval and fabrication is complete.

 

Kinsmen Playground Replacement

Playground design has been chosen and awarded.  Schedule will be confirmed with contractor once order lead times are known.

 

Dog Park

Work is being completed at the entrances to reduce the impact of mud.

Lights on the access road and parking lot will be installed late this summer / early fall depending on schedule from Fortis.

 

Westpark Boulevard Traffic Lights

The Developer is installing traffic lights on Westpark Boulevard at the Commercial entrance near Husky.

 

Street Light Upgrades

Fortis will be upgrading the street lights throughout the City to LED lights.  Their contractor is expected to start at the beginning of June and be complete by the end of June.

Return to full list >>
Roller & Laser

The City of Fort Saskatchewan endeavours to keep residents and visitors up-to-date about ongoing City construction projects.

For further information phone 780-992-6198.

List of Requests for Proposals (RFP)

Pre-qualified Contractors List

The City of Fort Saskatchewan is developing a Pre-qualified contractors list for miscellaneous work up to $50,000 in value. The pre-qualification process consists of a safety questionnaire, a qualifications questionnaire and a listing of the work contractors are interested in.

The pre-qualified list will be used to request quotations for small contracts that come up during annual operations. Contract values are expected to be below $50,000 per contract.

Documents will be continually accepted and contractors added to the list. It is anticipated that interested contractors will be required to update their information on an annual basis.


 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer