Construction Update: July 4, 2017

Post Date:July 04, 2017 11:09 am

High Performance Sports Field

Work continues on the buildings with the installation of roof decks and structural steel.  Interior walls and floor slabs will be installed this week. Installation of turf will take place in August.

The storm pond expansion is underway and the underground utilities are 98% complete.

The parking lots are scheduled to begin this week.

 

Curling Rink

Same status as last week. Interior demolition is complete and redesign work is being completed on the roof structure now that the existing roof is exposed.

 

Historic Precinct Site Improvements

Paving of the trails and the Warden's House Parking Lot is complete but landscaping continues.

Lights in the village area and parking lot will be installed later this summer or early fall.

  

Southfort Drive Widening

Ground preparation is ongoing.  Base gravel is being placed along Southfort Drive and concrete curb installation is underway.

Stripping of topsoil is continuing along Southfort Drive.

 

Harbour Pool Universal Change Room

The project design is underway.

 

Water Meter Radio Upgrade

Installation is unerway.

 

Skateboard Park

The Skateboard Society is fund-raising for the project.

 

Neighbourhood Rehabilitation - Ross Drive

The contractor will start construction this week.

 

Sewer Reline

Notices have gone out to affected residents; work will  start in early July.

 

City Facility Roof Replacements

Roofs on Harbour Pool, Legion, CN Station, and the James E. Graham Building will be replaced this summer.   

The Legion roof is underway.

 

Historic Precinct - Court House

Windows and doors on the Court House are being refurbished this summer. 

 

River Valley Staircase

A staircase will be constructed to access the River Valley from Riverpark Drive.  Contractor is working on the steel structure and installation will begin once approval and fabrication is complete.

 

Kinsmen Playground Replacement

Demolition of the existing park is underway.  

 

Dog Park

Lights on the access road and parking lot will be installed late this summer / early fall.

 

Westpark Boulevard Traffic Lights

Traffic lights are being installed on Westpark Boulevard near Husky this week. Once installed they will operate on flash for one week prior to being fully activated.

 

Street Light Upgrades

Fortis is upgrading street lights throughout the City to LED lights.  Work is expected to be complete in July.

  

Return to full list >>
Roller & Laser

The City of Fort Saskatchewan endeavours to keep residents and visitors up-to-date about ongoing City construction projects.

For further information phone 780-992-6198.

List of Requests for Proposals (RFP)

Pre-qualified Contractors List

The City of Fort Saskatchewan is developing a Pre-qualified contractors list for miscellaneous work up to $50,000 in value. The pre-qualification process consists of a safety questionnaire, a qualifications questionnaire and a listing of the work contractors are interested in.

The pre-qualified list will be used to request quotations for small contracts that come up during annual operations. Contract values are expected to be below $50,000 per contract.

Documents will be continually accepted and contractors added to the list. It is anticipated that interested contractors will be required to update their information on an annual basis.


 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer