Construction Update: July 17, 2017

Post Date:July 18, 2017 11:53 am

July 17th Status Report on City Projects

 

High Performance Sports Field

  • Interior walls and floor slabs in the change rooms will be installed soon
  • Base material is installed under the field and installation of the turf will take place in August
  • The storm pond expansion and underground utility work is complete
  • The parking lot and road works are underway

 Dow Centennial Centre area projects

Curling Rink

  • Foundation and piles are being installed for the expansion
  • New water service is installed
  • Parking lot is being restored with gravel; asphalt will be placed in August

 

Historic Precinct Site Improvements

  • Lights in the village area and parking lot to be installed late summer or early fall

  

Southfort Drive Widening

  • Base gravel being placed along Southfort Drive
  • Concrete curb installation is underway

 

Harbour Pool Universal Change Room

  • Project design is underway

 

Water Meter Radio Upgrade

  • Installation is underway

 

Skateboard Park

  • The Skateboard Society fund-raising for the project

 

Neighbourhood Rehabilitation - Ross Drive

  • Construction is underway
  • Underground tie-ins to 98 Ave are complete

 

Sewer Reline

  • Work is underway

 

City Facility Roof Replacements

  • The Legion is underway 
  • Harbour Pool, CN Station are complete.
  • The James E. Graham Building (Public Works) will be replaced this summer

 

Historic Precinct - Court House

  • Windows and doors on the Court House are being refurbished this summer

 

River Valley Staircase

  • Contractor is working on the steel structure for the staircase to the River Valley from Riverpark Drive
  • Installation will begin once approval and fabrication is complete

 

Kinsmen Playground Replacement

  • Demolition complete
  • Base work is underway
  • New concrete curbs will be poured this week

 

Dog Park

  • Lights on the access road and parking lot will be installed late summer/early fall

 

Westpark Boulevard Traffic Lights

  • Traffic lights are installed on Westpark Boulevard near Husky
  • They will operate on flash for one week prior to being fully activated

 

94 Street Traffic Lights at Cornerstone / Southpointe

  • The RFP for the design of the traffic signals closes July 31

 

City Hall Front Steps Refurbishing

  • Bids are being reviewed
  • Work will take place this summer

 

Return to full list >>
Roller & Laser

The City of Fort Saskatchewan endeavours to keep residents and visitors up-to-date about ongoing City construction projects.

For further information phone 780-992-6198.

List of Requests for Proposals (RFP)

Pre-qualified Contractors List

The City of Fort Saskatchewan is developing a Pre-qualified contractors list for miscellaneous work up to $50,000 in value. The pre-qualification process consists of a safety questionnaire, a qualifications questionnaire and a listing of the work contractors are interested in.

The pre-qualified list will be used to request quotations for small contracts that come up during annual operations. Contract values are expected to be below $50,000 per contract.

Documents will be continually accepted and contractors added to the list. It is anticipated that interested contractors will be required to update their information on an annual basis.


 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer