November 24, 2020 Updates

Posted On Tuesday November 24, 2020

The City of Fort Saskatchewan endeavours to keep residents and visitors up-to-date about ongoing City construction projects.

For further information please call 780-992-6248.


93rd Ave and Sherridon Drive Alley – Water Valve Replacement

 •  Work to replace valves and hydrants in the alley behind 93rd Ave and Sherridon Drive has been delayed to spring of 2021 due to below zero over night temperatures


112th Street Widening

 •  Paving is complete and the road is open
 •  Landscaping and a section of the asphalt trail will be completed in the spring of 2021


Animal Kennel

 •  Animal Kennel will be located at the Protective Services Building
 •  Interior and exterior finishing work is complete. Deficiencies will be addressed over the next few weeks.


City Hall Lower Level

 •  The lower level at City Hall is being developed into office space
 •  Drywall is complete
 •  Flooring is underway
 •  Work on the T-bar ceiling is underway


Hwy 15 & 119 Street Intersection

 •  Stripping and grading work on the east side of Highway 15 is complete for 2020. Work will resume in 2021.


Highway 15 Bridge Twinning

 •  Alberta Transportation is leading this project
 •  Work continues on the west side of the North Saskatchewan River
 •  Work is underway on the portion of Hwy 15 within the City of Fort Saskatchewan limits.
 •  Fort Centre Park Trail Closures in effect August 26, 2019 - October 1, 2022
 •  More Project Information


Neighbourhood Rehab – 101 Street

 •  Work to replace water, sewer and road infrastructure from 101 Ave to 99 Ave
 •  Work has been deferred to 2021


Neighbourhood Rehab – 108 Street

 •  Design work to replace water, sewer and road infrastructure on 108 Street from 101 Ave to the end of 108 Street will start in 2020. Construction is scheduled for 2021.


Pointe Aux Pins Road Widening

 •  The project will widen Point Aux Pins road from Wilshire Blvd to Range Road 231. This will bring the road up to the City’s urban standard and provide an asphalt trail on the north side of the road.
 •  Paving is complete for 2020. The final lift of asphalt will be placed in spring 2021.


River Road Slope Stabilization

 •  Tender to stabilize the slope adjacent to River Road (west of Keyera) is closed. A contractor has been selected.


Sportsplex Ice Plant Replacement

 •  Contractor has been hired to replace the ice plant. Ice plant is scheduled to be replaced in November
 •  Work on the room modifications for the new ice plant are underway


Sump Pump Retrofit Program

 •  Work has been deferred to 2021


Transfer Station Site Enhancements

 •  Tender for a consultant has closed. Proposals are being evaluated


Veterans Way Corridor Widening

 •  Detailed design work to add an additional lane on Highway 15 from 101 Street to the Highway 15/21 intersection is underway.